“gas station” matches 3 uses this ordinance names separately. We do not choose between them — they can have different answers, so every one is shown.
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| ARTS-1 the ordinance paragraph quoted here | 27 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| ARTS-2 the ordinance paragraph quoted here | 238 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| BF-1A the ordinance paragraph quoted here | 10 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| BF-1B the ordinance paragraph quoted here | 5 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| CG-2 the ordinance paragraph quoted here | 12 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4 the ordinance paragraph quoted here | 3,698 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4/CAP the ordinance paragraph quoted here | 38 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4/CAP/CHC the ordinance paragraph quoted here | 94 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4/CHC the ordinance paragraph quoted here | 211 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4/DC the ordinance paragraph quoted here | 30 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4/NO the ordinance paragraph quoted here | 52 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-4/RC the ordinance paragraph quoted here | 4 | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
| MU-5 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §514.2(f) Electric substation or natural gas regulator station; |
These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| SEFC-1 the ordinance paragraph quoted here | no parcels loaded | Conditional | Subtitle K §237.4(n) Gas station; and (o) Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here] |
| SEFC-1A the ordinance paragraph quoted here | 4 | Conditional | Subtitle K §237.4(n) Gas station; and (o) Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here] |
| SEFC-1B the ordinance paragraph quoted here | 24 | Conditional | Subtitle K §237.4(n) Gas station; and (o) Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here] |
These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| HE-1 the ordinance paragraph quoted here | 9 | Conditional | Subtitle K §412.1(j) Utility (basic) uses and supporting infrastructure facilities, such as an electrical substation, natural gas regulator station, pump station, telecommunications facility, or any co-generation facility. Additional setbacks and screening requirements may be City of Washington, D.C. | Title 11 - Zoning SUBTITLE K, CHAPTER 4-14 required as the Board of Zoning Adjustment deems necessary for protection of the surrounding neighborhood; and (k) Other principal uses that are not permitted by Subtitle K § 410, but not prohibited by Subtitle K § 415 shall be permitted in the HE zones as a special exception subject to the following conditions in addition to the general special exception criteria of Subtitle X and Subtitle K § 416; provided the Zoning Commission considers that the use is appropriate in furthering the purposes of the HE zones. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 19-04 published at 66 DCR 12137 (September 13, 2019). |
| HE-2 the ordinance paragraph quoted here | 5 | Conditional | Subtitle K §412.1(j) Utility (basic) uses and supporting infrastructure facilities, such as an electrical substation, natural gas regulator station, pump station, telecommunications facility, or any co-generation facility. Additional setbacks and screening requirements may be City of Washington, D.C. | Title 11 - Zoning SUBTITLE K, CHAPTER 4-14 required as the Board of Zoning Adjustment deems necessary for protection of the surrounding neighborhood; and (k) Other principal uses that are not permitted by Subtitle K § 410, but not prohibited by Subtitle K § 415 shall be permitted in the HE zones as a special exception subject to the following conditions in addition to the general special exception criteria of Subtitle X and Subtitle K § 416; provided the Zoning Commission considers that the use is appropriate in furthering the purposes of the HE zones. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 19-04 published at 66 DCR 12137 (September 13, 2019). |
| HE-3 the ordinance paragraph quoted here | 1 | Conditional | Subtitle K §412.1(j) Utility (basic) uses and supporting infrastructure facilities, such as an electrical substation, natural gas regulator station, pump station, telecommunications facility, or any co-generation facility. Additional setbacks and screening requirements may be City of Washington, D.C. | Title 11 - Zoning SUBTITLE K, CHAPTER 4-14 required as the Board of Zoning Adjustment deems necessary for protection of the surrounding neighborhood; and (k) Other principal uses that are not permitted by Subtitle K § 410, but not prohibited by Subtitle K § 415 shall be permitted in the HE zones as a special exception subject to the following conditions in addition to the general special exception criteria of Subtitle X and Subtitle K § 416; provided the Zoning Commission considers that the use is appropriate in furthering the purposes of the HE zones. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 19-04 published at 66 DCR 12137 (September 13, 2019). |
| HE-4 the ordinance paragraph quoted here | no parcels loaded | Conditional | Subtitle K §412.1(j) Utility (basic) uses and supporting infrastructure facilities, such as an electrical substation, natural gas regulator station, pump station, telecommunications facility, or any co-generation facility. Additional setbacks and screening requirements may be City of Washington, D.C. | Title 11 - Zoning SUBTITLE K, CHAPTER 4-14 required as the Board of Zoning Adjustment deems necessary for protection of the surrounding neighborhood; and (k) Other principal uses that are not permitted by Subtitle K § 410, but not prohibited by Subtitle K § 415 shall be permitted in the HE zones as a special exception subject to the following conditions in addition to the general special exception criteria of Subtitle X and Subtitle K § 416; provided the Zoning Commission considers that the use is appropriate in furthering the purposes of the HE zones. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 19-04 published at 66 DCR 12137 (September 13, 2019). |
Pro and reports for Washington, D.C. are coming soon.
We use this email only to tell you when Washington, D.C. launches. We never share it.
This answer is good through April 3, 2026 — that is the date the ordinance we hold runs to, as published by DC Office of Documents and Administrative Issuances. The District has since adopted something newer that we have not taken in yet, so parts of this may already be out of date.
(none) above means a parcel with no zone code assigned in the District's own data — 5 of them.Owner data from District of Columbia's property ownership records, retrieved September 25, 2026. CC BY 4.0.
Built from scripts/build_reverse_index.py, generated 2026-10-11T20:59:04+00:00.