These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| MU-1 the ordinance paragraph quoted here | 1 | Conditional | Subtitle U §504.1(e) Institutional, religious program uses, subject to the following conditions: (1) The part of the program conducted on the property shall be carried on within the existing place of worship building(s) or structure(s); (2) The operation of the program shall be such that it is not likely to become objectionable in the zone because of noise and traffic; (3) No sign or display indicating the location of the program shall be located on the outside of the building or the grounds; and (4) Any authorization by the Board of Zoning Adjustment shall be limited to a period of three (3) years, but may be renewed at the discretion of the Board of Zoning Adjustment; |
| MU-1/DC the ordinance paragraph quoted here | 176 | Conditional | Subtitle U §504.1(e) Institutional, religious program uses, subject to the following conditions: (1) The part of the program conducted on the property shall be carried on within the existing place of worship building(s) or structure(s); (2) The operation of the program shall be such that it is not likely to become objectionable in the zone because of noise and traffic; (3) No sign or display indicating the location of the program shall be located on the outside of the building or the grounds; and (4) Any authorization by the Board of Zoning Adjustment shall be limited to a period of three (3) years, but may be renewed at the discretion of the Board of Zoning Adjustment; |
| MU-2 the ordinance paragraph quoted here | 99 | Conditional | Subtitle U §504.1(e) Institutional, religious program uses, subject to the following conditions: (1) The part of the program conducted on the property shall be carried on within the existing place of worship building(s) or structure(s); (2) The operation of the program shall be such that it is not likely to become objectionable in the zone because of noise and traffic; (3) No sign or display indicating the location of the program shall be located on the outside of the building or the grounds; and (4) Any authorization by the Board of Zoning Adjustment shall be limited to a period of three (3) years, but may be renewed at the discretion of the Board of Zoning Adjustment; |
| MU-2/DC the ordinance paragraph quoted here | 39 | Conditional | Subtitle U §504.1(e) Institutional, religious program uses, subject to the following conditions: (1) The part of the program conducted on the property shall be carried on within the existing place of worship building(s) or structure(s); (2) The operation of the program shall be such that it is not likely to become objectionable in the zone because of noise and traffic; (3) No sign or display indicating the location of the program shall be located on the outside of the building or the grounds; and (4) Any authorization by the Board of Zoning Adjustment shall be limited to a period of three (3) years, but may be renewed at the discretion of the Board of Zoning Adjustment; |
Pro and reports for Washington, D.C. are coming soon.
We use this email only to tell you when Washington, D.C. launches. We never share it.
This answer is good through April 3, 2026 — that is the date the ordinance we hold runs to, as published by DC Office of Documents and Administrative Issuances. The District has since adopted something newer that we have not taken in yet, so parts of this may already be out of date.
(none) above means a parcel with no zone code assigned in the District's own data — 5 of them.Owner data from District of Columbia's property ownership records, retrieved September 25, 2026. CC BY 4.0.
Built from scripts/build_reverse_index.py, generated 2026-10-11T20:59:04+00:00.