“parking facility” matches 3 uses this ordinance names separately. We do not choose between them — they can have different answers, so every one is shown.
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| D-1 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-1-R the ordinance paragraph quoted here | 60 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-2 the ordinance paragraph quoted here | 78 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-3 the ordinance paragraph quoted here | 116 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-4 the ordinance paragraph quoted here | 131 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-4-R the ordinance paragraph quoted here | 194 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-5 the ordinance paragraph quoted here | 506 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-5-R the ordinance paragraph quoted here | 148 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-6 the ordinance paragraph quoted here | 316 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-6-R the ordinance paragraph quoted here | 113 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-7 the ordinance paragraph quoted here | 141 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| D-8 the ordinance paragraph quoted here | 30 | Allowed | Subtitle I §212 212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here] |
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| W-0 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| W-1 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| W-2 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-1 the ordinance paragraph quoted here | 66 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-10 the ordinance paragraph quoted here | 5 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-11 the ordinance paragraph quoted here | 2 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-12 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-13 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-14 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-15 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-2 the ordinance paragraph quoted here | 76 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-3 the ordinance paragraph quoted here | 20 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-4 the ordinance paragraph quoted here | 17 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-5 the ordinance paragraph quoted here | 6 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-6 the ordinance paragraph quoted here | 3 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-7 the ordinance paragraph quoted here | 53 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-8 the ordinance paragraph quoted here | 39 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-9 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(3) Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| District | Properties loaded | Code | What says so |
|---|---|---|---|
| W-0 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| W-1 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| W-2 the ordinance paragraph quoted here | no parcels loaded | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-1 the ordinance paragraph quoted here | 66 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-10 the ordinance paragraph quoted here | 5 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-11 the ordinance paragraph quoted here | 2 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-12 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-13 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-14 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-15 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-2 the ordinance paragraph quoted here | 76 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-3 the ordinance paragraph quoted here | 20 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-4 the ordinance paragraph quoted here | 17 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-5 the ordinance paragraph quoted here | 6 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-6 the ordinance paragraph quoted here | 3 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-7 the ordinance paragraph quoted here | 53 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-8 the ordinance paragraph quoted here | 39 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
| WR-9 the ordinance paragraph quoted here | 1 | Allowed | Subtitle U §517.1(d)(4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021). |
Pro and reports for Washington, D.C. are coming soon.
We use this email only to tell you when Washington, D.C. launches. We never share it.
This answer is good through April 3, 2026 — that is the date the ordinance we hold runs to, as published by DC Office of Documents and Administrative Issuances. The District has since adopted something newer that we have not taken in yet, so parts of this may already be out of date.
(none) above means a parcel with no zone code assigned in the District's own data — 5 of them.Owner data from District of Columbia's property ownership records, retrieved September 25, 2026. CC BY 4.0.
Built from scripts/build_reverse_index.py, generated 2026-10-11T20:59:04+00:00.