Where can I put a parking facility in Washington, D.C.?

“parking facility” matches 3 uses this ordinance names separately. We do not choose between them — they can have different answers, so every one is shown.

Parking Facility

Allowed by right in 12 districts

DistrictProperties loadedCodeWhat says so
D-1
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-1-R
the ordinance paragraph quoted here
60AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-2
the ordinance paragraph quoted here
78AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-3
the ordinance paragraph quoted here
116AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-4
the ordinance paragraph quoted here
131AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-4-R
the ordinance paragraph quoted here
194AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-5
the ordinance paragraph quoted here
506AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-5-R
the ordinance paragraph quoted here
148AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-6
the ordinance paragraph quoted here
316AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-6-R
the ordinance paragraph quoted here
113AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-7
the ordinance paragraph quoted here
141AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]
D-8
the ordinance paragraph quoted here
30AllowedSubtitle I §212
212 PARKING REQUIREMENTS AND STANDARDS [… quote continues in the ordinance; our stored extract stops here]

Surface parking lot accessory to the Washington Metropolitan Area Transit Authority garage facility (Square 700, Lot 857) on Square 661, Lot 805

Allowed by right in 18 districts

DistrictProperties loadedCodeWhat says so
W-0
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-1
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-2
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-1
the ordinance paragraph quoted here
66AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-10
the ordinance paragraph quoted here
5AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-11
the ordinance paragraph quoted here
2AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-12
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-13
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-14
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-15
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-2
the ordinance paragraph quoted here
76AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-3
the ordinance paragraph quoted here
20AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-4
the ordinance paragraph quoted here
17AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-5
the ordinance paragraph quoted here
6AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-6
the ordinance paragraph quoted here
3AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-7
the ordinance paragraph quoted here
53AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-8
the ordinance paragraph quoted here
39AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-9
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).

Surface parking lot accessory to the Washington Metropolitan Area Transit Authority garage facility (Square 700, Lot 857) on Square 700, Lot 46

Allowed by right in 18 districts

DistrictProperties loadedCodeWhat says so
W-0
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-1
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-2
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-1
the ordinance paragraph quoted here
66AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-10
the ordinance paragraph quoted here
5AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-11
the ordinance paragraph quoted here
2AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-12
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-13
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-14
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-15
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-2
the ordinance paragraph quoted here
76AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-3
the ordinance paragraph quoted here
20AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-4
the ordinance paragraph quoted here
17AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-5
the ordinance paragraph quoted here
6AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-6
the ordinance paragraph quoted here
3AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-7
the ordinance paragraph quoted here
53AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-8
the ordinance paragraph quoted here
39AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-9
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).

Pro and reports for Washington, D.C. are coming soon.

Notify me when Washington, D.C. launches

We use this email only to tell you when Washington, D.C. launches. We never share it.

This answer is good through April 3, 2026 — that is the date the ordinance we hold runs to, as published by DC Office of Documents and Administrative Issuances. The District has since adopted something newer that we have not taken in yet, so parts of this may already be out of date.

What this does not cover

Built from scripts/build_reverse_index.py, generated 2026-10-11T20:59:04+00:00.