Where can I put a parking garage in Washington, D.C.?

“parking garage” matches 11 uses this ordinance names separately. We do not choose between them — they can have different answers, so every one is shown.

Automated parking garage as principal use

Allowed only with a discretionary approval in 6 districts

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
NMU-5A/WP
the ordinance paragraph quoted here
23ConditionalSubtitle H §6009.1(f)
An automated parking garage as a principal use located and designed so as it is not likely to become objectionable to adjoining or nearby property because of noise, traffic, or other objectionable conditions;
NMU-7B/ES
the ordinance paragraph quoted here
31ConditionalSubtitle H §6009.1(f)
An automated parking garage as a principal use located and designed so as it is not likely to become objectionable to adjoining or nearby property because of noise, traffic, or other objectionable conditions;
NMU-7B/GA
the ordinance paragraph quoted here
129ConditionalSubtitle H §6009.1(f)
An automated parking garage as a principal use located and designed so as it is not likely to become objectionable to adjoining or nearby property because of noise, traffic, or other objectionable conditions;
NMU-7B/H-A
the ordinance paragraph quoted here
29ConditionalSubtitle H §6009.1(f)
An automated parking garage as a principal use located and designed so as it is not likely to become objectionable to adjoining or nearby property because of noise, traffic, or other objectionable conditions;
NMU-7B/H-H
the ordinance paragraph quoted here
1ConditionalSubtitle H §6009.1(f)
An automated parking garage as a principal use located and designed so as it is not likely to become objectionable to adjoining or nearby property because of noise, traffic, or other objectionable conditions;
NMU-8B/H-H
the ordinance paragraph quoted here
1ConditionalSubtitle H §6009.1(f)
An automated parking garage as a principal use located and designed so as it is not likely to become objectionable to adjoining or nearby property because of noise, traffic, or other objectionable conditions;

Gasoline service station as an accessory use to a parking garage or public storage garage

Allowed by right in 2 districts

DistrictProperties loadedCodeWhat says so
ARTS-3
the ordinance paragraph quoted here
223AllowedSubtitle U §510.1(k)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (1) All portions of the gasoline service station shall be located entirely within the garage; (2) No part of the accessory use shall be visible from a sidewalk; and (3) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
CG-3
the ordinance paragraph quoted here
1AllowedSubtitle U §510.1(k)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (1) All portions of the gasoline service station shall be located entirely within the garage; (2) No part of the accessory use shall be visible from a sidewalk; and (3) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;

Motor vehicle – gasoline service station as accessory use to parking garage or public storage garage

Allowed by right in 13 districts

DistrictProperties loadedCodeWhat says so
NMU-4/CC1
the ordinance paragraph quoted here
33AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/CC2
the ordinance paragraph quoted here
1AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/CP
the ordinance paragraph quoted here
59AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/GA
the ordinance paragraph quoted here
96AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/H-A
the ordinance paragraph quoted here
94AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/H-H
the ordinance paragraph quoted here
36AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/H-R
the ordinance paragraph quoted here
62AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/TK
the ordinance paragraph quoted here
33AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-4/WP
the ordinance paragraph quoted here
10AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-5A/H-H
the ordinance paragraph quoted here
16AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-5A/H-R
the ordinance paragraph quoted here
13AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-5A/PAE
the ordinance paragraph quoted here
33AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;
NMU-6B/H-H
the ordinance paragraph quoted here
2AllowedSubtitle H §6006.1(i)(4)
Gasoline service station as an accessory use to a parking garage or public storage garage; provided: (A) (A) All portions of the gasoline service station shall be located entirely within the garage; (B) No part of the accessory use shall be visible from a sidewalk; and (C) Signs or displays indicating the existence of the accessory use shall not be visible from the outside of the garage;

Parking garage

Allowed by right in 11 districts

DistrictProperties loadedCodeWhat says so
ARTS-3
the ordinance paragraph quoted here
223AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
CG-3
the ordinance paragraph quoted here
1AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
CG-4
the ordinance paragraph quoted here
130AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-3
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-3A
the ordinance paragraph quoted here
642AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-3B
the ordinance paragraph quoted here
1AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-6A
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-6B
the ordinance paragraph quoted here
69AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-6B/DC
the ordinance paragraph quoted here
21AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-7A
the ordinance paragraph quoted here
2AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;
MU-7B
the ordinance paragraph quoted here
490AllowedSubtitle U §510.1(t)
Parking garage, which may include a car wash and interior detailing, as a permitted accessory use within the permitted parking garage;

Allowed only with a discretionary approval in 4 districts

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
MU-1
the ordinance paragraph quoted here
1ConditionalSubtitle U §504.1(i)
Parking garages, subject to the following conditions: City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-5 (1) The use and all related facilities shall be located and designed so that they are not likely to become objectionable to adjoining and nearby property because of noise, traffic, or other objectionable conditions; (2) The present character and future development of the neighborhood shall not be affected adversely by the use; (3) The parking garage shall serve either residential uses or provide short-term parking for retail, service, and public facility uses, but shall not provide all-day commuter parking; (4) The parking provided shall be within eight hundred feet (800 ft.) of the use to be served, and shall be necessary to that use; and (5) Minor services for users of the garage such as hand-washing, polishing, interior detailing, tire inflation, and battery charging and electric vehicle charging stations shall be permitted as accessory uses within a permitted parking garage;
MU-1/DC
the ordinance paragraph quoted here
176ConditionalSubtitle U §504.1(i)
Parking garages, subject to the following conditions: City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-5 (1) The use and all related facilities shall be located and designed so that they are not likely to become objectionable to adjoining and nearby property because of noise, traffic, or other objectionable conditions; (2) The present character and future development of the neighborhood shall not be affected adversely by the use; (3) The parking garage shall serve either residential uses or provide short-term parking for retail, service, and public facility uses, but shall not provide all-day commuter parking; (4) The parking provided shall be within eight hundred feet (800 ft.) of the use to be served, and shall be necessary to that use; and (5) Minor services for users of the garage such as hand-washing, polishing, interior detailing, tire inflation, and battery charging and electric vehicle charging stations shall be permitted as accessory uses within a permitted parking garage;
MU-2
the ordinance paragraph quoted here
99ConditionalSubtitle U §504.1(i)
Parking garages, subject to the following conditions: City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-5 (1) The use and all related facilities shall be located and designed so that they are not likely to become objectionable to adjoining and nearby property because of noise, traffic, or other objectionable conditions; (2) The present character and future development of the neighborhood shall not be affected adversely by the use; (3) The parking garage shall serve either residential uses or provide short-term parking for retail, service, and public facility uses, but shall not provide all-day commuter parking; (4) The parking provided shall be within eight hundred feet (800 ft.) of the use to be served, and shall be necessary to that use; and (5) Minor services for users of the garage such as hand-washing, polishing, interior detailing, tire inflation, and battery charging and electric vehicle charging stations shall be permitted as accessory uses within a permitted parking garage;
MU-2/DC
the ordinance paragraph quoted here
39ConditionalSubtitle U §504.1(i)
Parking garages, subject to the following conditions: City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-5 (1) The use and all related facilities shall be located and designed so that they are not likely to become objectionable to adjoining and nearby property because of noise, traffic, or other objectionable conditions; (2) The present character and future development of the neighborhood shall not be affected adversely by the use; (3) The parking garage shall serve either residential uses or provide short-term parking for retail, service, and public facility uses, but shall not provide all-day commuter parking; (4) The parking provided shall be within eight hundred feet (800 ft.) of the use to be served, and shall be necessary to that use; and (5) Minor services for users of the garage such as hand-washing, polishing, interior detailing, tire inflation, and battery charging and electric vehicle charging stations shall be permitted as accessory uses within a permitted parking garage;

Parking garage (principal use)

Allowed only with a discretionary approval in 2 districts

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
RA-5
the ordinance paragraph quoted here
188ConditionalSubtitle U §420.1(i)
A parking garage constructed as a principal use on a lot other than an alley lot in an RA-5 zone subject to the following conditions: (1) The use shall comply with all provisions of Subtitle C, Chapter 23 of this title; (2) No commercial advertising signs shall be permitted outside a building, except a sign advertising the rates as required by Chapter 6 of Title 24 DCMR, Public Space and Safety; City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 4-6 (3) The Board of Zoning Adjustment shall find that no dangerous or otherwise objectionable traffic conditions will result, that the present character and future development of the neighborhood will not be affected adversely, and that the parking garage is reasonably necessary and convenient to other uses in the vicinity; and (4) Before taking final action on an application for the use, the Board of Zoning Adjustment shall submit the application to the D.C. Department of Transportation for review and report;
RA-5/DC
the ordinance paragraph quoted here
39ConditionalSubtitle U §420.1(i)
A parking garage constructed as a principal use on a lot other than an alley lot in an RA-5 zone subject to the following conditions: (1) The use shall comply with all provisions of Subtitle C, Chapter 23 of this title; (2) No commercial advertising signs shall be permitted outside a building, except a sign advertising the rates as required by Chapter 6 of Title 24 DCMR, Public Space and Safety; City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 4-6 (3) The Board of Zoning Adjustment shall find that no dangerous or otherwise objectionable traffic conditions will result, that the present character and future development of the neighborhood will not be affected adversely, and that the parking garage is reasonably necessary and convenient to other uses in the vicinity; and (4) Before taking final action on an application for the use, the Board of Zoning Adjustment shall submit the application to the D.C. Department of Transportation for review and report;

Parking lot, parking garage, or public storage garage

Allowed by right in 13 districts

DistrictProperties loadedCodeWhat says so
ARTS-1
the ordinance paragraph quoted here
27AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
ARTS-2
the ordinance paragraph quoted here
238AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
BF-1A
the ordinance paragraph quoted here
10AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
BF-1B
the ordinance paragraph quoted here
5AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
CG-2
the ordinance paragraph quoted here
12AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4
the ordinance paragraph quoted here
3,698AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4/CAP
the ordinance paragraph quoted here
38AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4/CAP/CHC
the ordinance paragraph quoted here
94AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4/CHC
the ordinance paragraph quoted here
211AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4/DC
the ordinance paragraph quoted here
30AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4/NO
the ordinance paragraph quoted here
52AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-4/RC
the ordinance paragraph quoted here
4AllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.
MU-5
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §514.2(k)
Parking lot, parking garage, or public storage garage; and (l) Public utility pumping station.

Surface parking lot accessory to the Washington Metropolitan Area Transit Authority garage facility (Square 700, Lot 857) on Square 661, Lot 805

Allowed by right in 18 districts

DistrictProperties loadedCodeWhat says so
W-0
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-1
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-2
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-1
the ordinance paragraph quoted here
66AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-10
the ordinance paragraph quoted here
5AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-11
the ordinance paragraph quoted here
2AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-12
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-13
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-14
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-15
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-2
the ordinance paragraph quoted here
76AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-3
the ordinance paragraph quoted here
20AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-4
the ordinance paragraph quoted here
17AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-5
the ordinance paragraph quoted here
6AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-6
the ordinance paragraph quoted here
3AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-7
the ordinance paragraph quoted here
53AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-8
the ordinance paragraph quoted here
39AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-9
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(3)
Square 661, Lot 805, for a period of five (5) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the five (5)-year period renewable by the Zoning Commission; and City of Washington, D.C. | Title 11 - Zoning SUBTITLE U, CHAPTER 5-44 (4) Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).

Surface parking lot accessory to the Washington Metropolitan Area Transit Authority garage facility (Square 700, Lot 857) on Square 700, Lot 46

Allowed by right in 18 districts

DistrictProperties loadedCodeWhat says so
W-0
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-1
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
W-2
the ordinance paragraph quoted here
no parcels loadedAllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-1
the ordinance paragraph quoted here
66AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-10
the ordinance paragraph quoted here
5AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-11
the ordinance paragraph quoted here
2AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-12
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-13
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-14
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-15
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-2
the ordinance paragraph quoted here
76AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-3
the ordinance paragraph quoted here
20AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-4
the ordinance paragraph quoted here
17AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-5
the ordinance paragraph quoted here
6AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-6
the ordinance paragraph quoted here
3AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-7
the ordinance paragraph quoted here
53AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-8
the ordinance paragraph quoted here
39AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).
WR-9
the ordinance paragraph quoted here
1AllowedSubtitle U §517.1(d)(4)
Square 700, Lot 46, for a period of three (3) years maximum, beginning from the date of issuance of a certificate of occupancy for such use, with the three (3)-year period renewable by the Zoning Commission. SOURCE: Final Rulemaking & Order No. 08-06A published at 63 DCR 2447 (March 4, 2016 – Part 2); Final Rulemaking & Order No. 20-20 published at 68 DCR 2485 (March 5, 2021).

Temporary parking lot or garage (max 5-year approval, renewable)

Allowed only with a discretionary approval in 2 districts

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
SEFC-1A
the ordinance paragraph quoted here
4ConditionalSubtitle K §237.4(o)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here]
SEFC-1B
the ordinance paragraph quoted here
24ConditionalSubtitle K §237.4(o)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here]

Temporary parking lot or garage as principal use (maximum 5-year approval, renewable)

Allowed only with a discretionary approval in 1 district

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
SEFC-1
the ordinance paragraph quoted here
no parcels loadedConditionalSubtitle K §237.4(o)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here]

Temporary parking lot or garage as principal use at or above grade (maximum 5-year approval, renewable)

Allowed only with a discretionary approval in 2 districts

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
SEFC-2
the ordinance paragraph quoted here
14ConditionalSubtitle K §238.3(g)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use, located at or above grade;
SEFC-3
the ordinance paragraph quoted here
1ConditionalSubtitle K §238.3(g)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use, located at or above grade;

Pro and reports for Washington, D.C. are coming soon.

Notify me when Washington, D.C. launches

We use this email only to tell you when Washington, D.C. launches. We never share it.

This answer is good through April 3, 2026 — that is the date the ordinance we hold runs to, as published by DC Office of Documents and Administrative Issuances. The District has since adopted something newer that we have not taken in yet, so parts of this may already be out of date.

What this does not cover

Built from scripts/build_reverse_index.py, generated 2026-10-11T20:59:04+00:00.