Zonescore.

We're still verifying Washington, D.C.'s answers against the District code.

Washington, D.C. zoning › where can I put this

Where can I put a temporary parking lot or garage (max 5 year approval, renewable) in Washington, D.C.?

Temporary parking lot or garage (max 5-year approval, renewable)

Allowed only with a discretionary approval in 2 districts

These require a hearing or an approval from the District. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
SEFC-1A
the ordinance paragraph quoted here
4ConditionalSubtitle K §237.4(o)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here]
SEFC-1B
the ordinance paragraph quoted here
24ConditionalSubtitle K §237.4(o)
Temporary parking lot or garage, for a maximum approval period of five (5) years, which may be renewed by the Zoning Commission, as a principal use located at or above grade. 1 The Office of the Attorney General included this revision to subparagraph (2)(A) to reflect the wording of the provision as it appeared at 11 DCMR § 1803.8(a)(1 of the Zoning Regulations of 1958 as of the date of its repeal and replacement with 11-K DCMR 237.4(a)(2)(A). Subparagraph 1803.8 (a)(1) read: (a) Accommodates the design of a public entrance to the Navy Yard Metrorail Station on Parcel A. The applicant shall demonstrate proactive engagement with the Washington Metrorail Area Transit Authority (WMATA) in the planning and design of Parcel A as a part of the above design review as set forth below: (1) If the applicant moves forward with the design of Parcel A before WMATA is ready to construct the third entrance, the applicant shall demonstrate that it has coordinated with WMATA to determine how to ensure that the design of Parcel A accommodates the planned entrance; and … [… quote continues in the ordinance; our stored extract stops here]

Pro and reports for Washington, D.C. are coming soon.

Notify me when Washington, D.C. launches

We use this email only to tell you when Washington, D.C. launches. We never share it.

This answer is good through April 3, 2026 — that is the date the ordinance we hold runs to, as published by DC Office of Documents and Administrative Issuances. The District has since adopted something newer that we have not taken in yet, so parts of this may already be out of date.

What this does not cover

Built from scripts/build_reverse_index.py, generated 2026-10-11T20:59:04+00:00.