Where can I put a sawmilling in Fairfax County, VA?

Fairfax County, VA, excluding the incorporated towns, which run their own zoning.

Sawmilling

It depends in 3 districts

DistrictProperties loadedCodeWhat says so
R-1 Varies
Depends: special permit, only if the use is a type or location that Sec. 4102.7.N(1) allows here and the use stays within the limits in Sec. 4102.7.N
when the use is a type or location that Sec. 4102.7.N(1) allows here
Sec. 4102.7.N(1), Sec. 4102.7.N(2), Sec. 4102.7.N(4), Sec. 4102.7.N(5), Sec. 4102.7.N(6), Sec. 4102.7.N(7): Sawmilling operations are limited to timber grown on the same property. … A permit issued for a sawmilling operation must not exceed two years in duration. The permit may be extended in conformance with the provisions of subsection 8100.4.D(3) for up to two successive periods of two years each, but the sawmilling operation may not exist for more than a total of six years. … The mill may operate only one saw at any one time, and no blade may exceed 48 inches in diameter. … There may be a maximum of five employees per shift, and no more than one shift is permitted in any 24-hour period. … The on-site stockpile is limited to not more than 100 unsawn logs and not more than 8,500 board feet of sawn lumber at any one time. … The hours and days of operation will be established by the BZA, except that the operation may not occur between 8:00 PM and 8:00 AM.
26,110
no ZIP in the county's record (1,933), 20120 (98), 20121 (30), 20124 (80), 20151 (54), 20170 (711), 20171 (1,356), 20190 (27), 20191 (74), 20194 (237), 22003 (800), 22015 (434), 22027 (57), 22030 (566), 22031 (1,068), 22032 (475), 22033 (532), 22039 (1,063), 22042 (316), 22043 (110), 22044 (35), 22066 (2,705), 22079 (1,110), 22101 (1,579), 22102 (1,905), 22124 (3,260), 22150 (429), 22151 (1), 22152 (104), 22153 (197), 22180 (203), 22181 (892), 22182 (2,744), 22303 (1), 22306 (5), 22309 (6), 22310 (236), 22312 (55), 22315 (622)
SPSec. 4101
Read from the use table: Table 4101.1, row "Sawmilling", column "R-1", reads "SP". Sec. 4101.1 says: E. An “SP” in a cell of Table 4101.1 or Table 4101.2 indicates that the use can be established only with BZA approval of a special permit in accordance with subsection 8101.3 and the related use standards.
R-A Varies
Depends: special permit, only if the use is a type or location that Sec. 4102.7.N(1) allows here and the use stays within the limits in Sec. 4102.7.N
when the use is a type or location that Sec. 4102.7.N(1) allows here
Sec. 4102.7.N(1), Sec. 4102.7.N(2), Sec. 4102.7.N(4), Sec. 4102.7.N(5), Sec. 4102.7.N(6), Sec. 4102.7.N(7): Sawmilling operations are limited to timber grown on the same property. … A permit issued for a sawmilling operation must not exceed two years in duration. The permit may be extended in conformance with the provisions of subsection 8100.4.D(3) for up to two successive periods of two years each, but the sawmilling operation may not exist for more than a total of six years. … The mill may operate only one saw at any one time, and no blade may exceed 48 inches in diameter. … There may be a maximum of five employees per shift, and no more than one shift is permitted in any 24-hour period. … The on-site stockpile is limited to not more than 100 unsawn logs and not more than 8,500 board feet of sawn lumber at any one time. … The hours and days of operation will be established by the BZA, except that the operation may not occur between 8:00 PM and 8:00 AM.
13
22066 (7), 22079 (1), 22124 (3), 22182 (2)
SPSec. 4101
Read from the use table: Table 4101.1, row "Sawmilling", column "R-A", reads "SP". Sec. 4101.1 says: E. An “SP” in a cell of Table 4101.1 or Table 4101.2 indicates that the use can be established only with BZA approval of a special permit in accordance with subsection 8101.3 and the related use standards.
R-E Varies
Depends: special permit, only if the use is a type or location that Sec. 4102.7.N(1) allows here and the use stays within the limits in Sec. 4102.7.N
when the use is a type or location that Sec. 4102.7.N(1) allows here
Sec. 4102.7.N(1), Sec. 4102.7.N(2), Sec. 4102.7.N(4), Sec. 4102.7.N(5), Sec. 4102.7.N(6), Sec. 4102.7.N(7): Sawmilling operations are limited to timber grown on the same property. … A permit issued for a sawmilling operation must not exceed two years in duration. The permit may be extended in conformance with the provisions of subsection 8100.4.D(3) for up to two successive periods of two years each, but the sawmilling operation may not exist for more than a total of six years. … The mill may operate only one saw at any one time, and no blade may exceed 48 inches in diameter. … There may be a maximum of five employees per shift, and no more than one shift is permitted in any 24-hour period. … The on-site stockpile is limited to not more than 100 unsawn logs and not more than 8,500 board feet of sawn lumber at any one time. … The hours and days of operation will be established by the BZA, except that the operation may not occur between 8:00 PM and 8:00 AM.
7,380
no ZIP in the county's record (1,087), 20171 (8), 20190 (47), 20191 (68), 20194 (1), 20195 (1), 22039 (5), 22066 (3,320), 22079 (1,082), 22101 (4), 22102 (639), 22124 (340), 22181 (424), 22182 (353), 22308 (1)
SPSec. 4101
Read from the use table: Table 4101.1, row "Sawmilling", column "R-E", reads "SP". Sec. 4101.1 says: E. An “SP” in a cell of Table 4101.1 or Table 4101.2 indicates that the use can be established only with BZA approval of a special permit in accordance with subsection 8101.3 and the related use standards.

Pro and reports for Fairfax County, VA are coming soon.

Notify me when Fairfax County, VA launches

We use this email only to tell you when Fairfax County, VA launches. We never share it.

This answer is good through July 1, 2026 — that is the date the ordinance we hold runs to, as published by Fairfax County. We last checked with the county on September 14, 2026 and found nothing newer. That is a check on that date, not a promise about today.

What this does not cover