We're still verifying Loudoun County, VA's answers against the county code.

Loudoun County, VA zoning › where can I put this

Where can I put a solar facility, utility scale in Loudoun County, VA?

Loudoun County, VA, excluding the incorporated towns, which run their own zoning.

Solar Facility, Utility Scale

It depends in 1 district

DistrictProperties loadedCodeWhat says so
GI Varies
Depends: by right if the use meets the standards in Sec. 4.07.06, otherwise special exception
the use table's own cell
190
20105 (5), 20132 (1), 20147 (2), 20148 (3), 20151 (1), 20152 (13), 20164 (2), 20166 (154), 20175 (9)
P/STable 3.02.05-1
Read from the use table: Table 3.02.05-1 on PDF page 201, row "Solar Facility, Utility Scale", column "GI", reads "P/S" (P/S = Varies -- Permitted or Special Exception, per Chapter 4).
GI (same district)
when the use meets the standards in Sec. 4.07.06
190
20105 (5), 20132 (1), 20147 (2), 20148 (3), 20151 (1), 20152 (13), 20164 (2), 20166 (154), 20175 (9)
PSec. 4.07.06
Utility Scale Solar Facilities that meet all of the following standards are a permitted use in the GI Zoning District. a. Ground-Mounted. The solar facility must utilize only ground-mounted solar panels. b. Size of Use. 1. The solar facility must be located on a parcel with a minimum size of 500 acres. 2. Abutting Lots. The solar facility also may be located on lots that abut the minimum 500- acre parcel if such abutting lots have a minimum size of 250 acres. c. Location/Dimensional. 1. Height. The solar facility must meet Section 4.07.06.B.3.c.1. 2. Setbacks. The solar facility must meet Section 4.07.06.B.3.c.2, except that all types of erosion and sediment control and/or stormwater managem [… quote continues in the ordinance; our stored extract stops here]
GI (same district)
when the use does not meet the standards in Sec. 4.07.06
190
20105 (5), 20132 (1), 20147 (2), 20148 (3), 20151 (1), 20152 (13), 20164 (2), 20166 (154), 20175 (9)
SSec. 4.07.06
Utility Scale Solar Facilities that meet all of the following standards are a permitted use in the GI Zoning District. a. Ground-Mounted. The solar facility must utilize only ground-mounted solar panels. b. Size of Use. 1. The solar facility must be located on a parcel with a minimum size of 500 acres. 2. Abutting Lots. The solar facility also may be located on lots that abut the minimum 500- acre parcel if such abutting lots have a minimum size of 250 acres. c. Location/Dimensional. 1. Height. The solar facility must meet Section 4.07.06.B.3.c.1. 2. Setbacks. The solar facility must meet Section 4.07.06.B.3.c.2, except that all types of erosion and sediment control and/or stormwater managem [… quote continues in the ordinance; our stored extract stops here]

Allowed only with a discretionary approval in 1 district

These require a hearing or an approval from the county. They are not a “no”, and they are not a “yes” either.

DistrictProperties loadedCodeWhat says so
MR-HI
the use table's own cell
45
20147 (4), 20152 (24), 20175 (17)
STable 3.02.05-1
Read from the use table: Table 3.02.05-1 on PDF page 201, row "Solar Facility, Utility Scale", column "MR-HI", reads "S" (S = Special Exception).

Pro and reports for Loudoun County, VA are coming soon.

Notify me when Loudoun County, VA launches

We use this email only to tell you when Loudoun County, VA launches. We never share it.

The planned districts are a different answer, not a missing one

61415 of the loaded properties are in a planned district. For those, what you may build is set by an approved Concept Development Plan for that development, not by the county-wide use table. That is a real answer: the plan governs, and it is held by the county.

Concept Development Plan (CDP): Part of a Zoning Map Amendment (ZMAP) or Zoning Concept Plan Amendment (ZCPA) application. The CDP may consist of both a visual and a written representation depicting the layout and/or design of the development, and all associated proffers. When the CDP is approved through the legislative process, the CDP then becomes binding on the developer and his successors in interests.

Chapter 12, Definitions -- Concept Development Plan (CDP)

We cannot retrieve the plan for you — the county publishes the rezoning case as a polygon layer but the plan document itself is not machine-addressable (measured S199). Ask Loudoun County Building & Development for the approved plan covering the property.

This answer is good through March 18, 2025 — that is the date the ordinance we hold runs to, as published by Loudoun County. We last checked with the county on September 14, 2026 and found nothing newer. That is a check on that date, not a promise about today.

What this does not cover