ZoneScore
Fairfax County zoning › I-4

I-4Medium Intensity Industrial (I-4)

Fairfax County, VA · Fairfax County Zoning Ordinance

I-4 provides for a wide range of industrial uses -- scientific research, development and training, offices, and medium-intensity production of goods -- at greater intensity than I-3. Height 75ft. FAR 0.50 (up to 0.70 by Board). Front setback equal to building height (at least 40ft). Landscaped open space min 15%. Min lot 20,000 sq ft. Section 2104.4.

Development standards in I-4

Maximum FAR0.5
Maximum height75 ft
Minimum lot size20000 sq ft
Read from Fairfax County Zoning Ordinance, effective through 2026-07-01.

Permitted uses in I-4

"Conditional" means the use generally requires a public hearing or special-exception approval — a very different timeline and risk profile from a by-right permit.

This is the zone. What about the parcel?

Zone rules are the starting point — the answer for a specific property also depends on lot size, overlays, existing improvements and site conditions. Run a free address lookup to see what applies to one property.

Look up an address

Sources

Values are read from the Fairfax County Zoning Ordinance.

Other Fairfax County zones

C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 I-2 I-3 I-5 I-6 I-I PCC PDC PDH PDH-1 PDH-12 PDH-16 PDH-2 PDH-20 PDH-3 PDH-30 PDH-4 PDH-40 PDH-5 PDH-8 PRC PRM PTC R-1 R-12 R-16 R-2 R-20 R-3 R-30 R-4 R-5 R-8 R-A R-C R-E R-MHP